Brugge V
In Bruges, we have started the repowering of the wind farm, replacing 7 older turbines with 4 modern turbines.
This upgrade will more than double the production of renewable electricity. The dismantling works started in May 2026, with the new turbines expected to be operational by summer 2027.
Technical data Brugge V
Brugge
June 2027
4
V126
3.6 MW
137.5 m
200 m